Spring Field Review Site 08 2008BuncombeLong Shoals bridge on I-26 over NC 146
~ The project required a long rock causeway for construction access. The Contractor was able to convey specific means and methods to the regulatory agencies, which facilitated a straightforward permitting process.
~ Design-Build Project.
 
 ~ 250 ft. single span curved steel girder bridge over a single point urban interchange (SPUI) with MSE walls in front of the end bents.
 
 ~ HPS utilized for girders.
 
 ~ 4-span bridge on NC 146 over the French Broad River utilizes 72" modified bulb-tee and 45" prestressed girders.